![]() |
||
![]() |
Factory |
|
![]() |
||
Factory | ||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
Grabbing cranes | ||
![]() |
6, 3 te SWL slewing grabbing crane at max. 23 mtr radius |
|
![]() |
||
![]() |
8 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
Hoist / closing winch
6,3 te SWL |
|
![]() |
||
![]() |
7 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
6,3 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
7 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
8 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
6,3 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
2x 16 te SWL slewing grabbing cranes at max. 30 mtr radius |
|
![]() |
||
![]() |
30 te SWL slewing grabbing crane at max. 37 mtr radius |
|
![]() |
||
Multi-purpose cranes | ||
![]() |
40 te SWL multi-purpose crane |
|
![]() |
||
![]() |
45 te SWL multi-purpose crane |
|
![]() |
||
![]() |
2x 40 te SWL multi-purpose cranes |
|
![]() |
||
![]() |
15 te SWL slewing grabbing crane |
|
![]() |
||
![]() |
45 te SWL multi-purpose crane |
|
![]() |
||
![]() |
45 te SWL multi-purpose crane |
|
![]() |
||
![]() |
45 te SWL multi-purpose crane |
|
![]() |
||
![]() |
40 te SWL double jib crane for container handling and timber packages |
|
![]() |
||
Gantry cranes | ||
![]() |
2x 32 te SWL gantry cranes |
|
![]() |
||
![]() |
32 te SWL container crane in operation near London |
|
![]() |
||
![]() |
2x 32 te SWL container cranes
|
|
![]() |
||
![]() |
2x 32 te SWL container cranes |
|
![]() |
||
Floating cranes | ||
![]() |
32 te SWL floating crane in operation on the east coast of Kalimantan |
|
![]() |
||
![]() |
25 te SWL floating crane in operation, loading a vessel 40 miles off shore |
|
![]() |
||
![]() |
25 te SWL floating crane |
|
![]() |
||
![]() |
25 te SWL floating crane |
|
![]() |
||
Transport & erection | ||
![]() |
Assembling of the pedestal of a 25 tons slewing grabbing crane |
|
![]() |
||
![]() |
Assembling of the machinery house of a 25 tons slewing grabbing crane |
|
![]() |
||
![]() |
Pre-assembled crane parts waiting for transport in the Port of Rotterdam |
|
![]() |
||
![]() |
Transport of the pre-assembled crane parts by Jumbo Heavy Lift Ship |
|
![]() |
||
![]() |
The complete electrical control system is engineered, assembled and tested in house |